User: I want you to act as a seasoned engineer / house builder / contractor. edit

I want you to act as a seasoned engineer / house builder / contractor. I want you to prepare a detailed bill of quantities for a kitchen to be built as an add on to an existing house. separate costing for materials and labor.

the size of the kitchen is 2 meters in length x 5.4 meters wide.

the flooring will be covered by tiles (estimate Php7,040 from Wilcon).

the ceiling will be covered with pvc ceiling panel (estimate Php4,040 from Wilcon)

a 0.63m x 3.55 countertop will be built inside - use best value laminate from Wilcon.

50cm*40cm single kitchen sink undermount.

the walls will remain bare and simply painted over.

side door will use a sliding door 120cm wide, 210 cm tall (estimate Php11,716)

use p. tech corrugated Asa roof sheet (Php2,150 per sheet, sheet size 1.5mmx1.13mx12ft - estimate required roofing).

feel free to replace the materials if you find a better priced one - just make sure to include the link to the product.

the kitchen has no windows. only opening is the sliding door at the side and the adjoining dining room. note that the wall between the kitchen and dining room could be demolished depending on the price.

CHB for walls. Slab on Grade as foundation type. Lean-to roof structure. no need to add heater to water supply. distance to main line is between 12 to 12.5 meters. no need for grease trap. range hood for cooking fumes. light fixtures/outlets and dedicated circuits for appliances.

make sure to include estimates for masonry, plumbing and electrical works. ask me if i missed anything and if i want to include it. add export button to the BOQ. optimize costing for construction located in Bocaue, Bulacan.

Assistant: Great — before I generate a full detailed Bill of Quantities BOQ with separate material & labor costing optimized for B… edit

Great — before I generate a full detailed Bill of Quantities (BOQ) with separate material & labor costing optimized for Bocaue, Bulacan, I need a few clarifications so the estimate is accurate and complete.

Please answer the following:

1. Wall Height What is the wall height from floor to ceiling? Example: 2.4m, 2.7m, 3.0m edit
  1. Wall Between Kitchen & Dining Room Do you plan to demolish the wall entirely, or keep it with a door opening only? If yes: approximate width of opening?
  2. Wall Finish You said “bare & simply painted” — do you want smooth plaster & paint, or textured finish? Plastering affects cost.
1. Side Sliding Door Material Prefer aluminum frame with glass, vinyl, or steel? edit
  1. Threshold / Security Grill Needed or none?
1. Water Source - Will this connect to existing household water line? - Need new water line trenching? If yes, approximate route length beyond the 12–12.5m? edit
  1. Drainage - Do you already have a sewer line near the kitchen? - If not, need new sewer/drain line installation?
  2. Faucet Budget range? Standard lever / pull-out / branded?
1. Number of Light Fixtures - Ceiling lights / task lights (over countertops)? Estimate: None / 2 / 3 / 4 edit
  1. Outlets How many? - General outlets - Dedicated circuits for: refrigerator, range hood, microwave, rice cooker
1. Do you want allowances for the following? edit
  • Range hood
  • Cooktop (gas or electric)
  • Built-in oven
  • Refrigerator

If yes, preferred sizes & approximate budget per item.

1. For the 0.63m x 3.55m countertop: edit
  • Do you want cabinet carcass included (wood + hardware)?
  • Or just the countertop surface?
  1. Laminate style preference:
  • Standard
  • Premium Wood-grain
  • Stone look
1. Should labor rates include: edit
  • Permit costs
  • Waste disposal / dumpster
  • Scaffold rental
  • Tools & equipment rental (Check yes/no for each)
Would you like estimates for: edit
  • Ceramic or metal backsplash behind sink/cooktop
  • Exhaust vent ducting
  • Under-sink cabinet
  • Shelving / upper cabinets
  • Paint primer & sealer

Once I have your answers, I will produce a comprehensive BOQ with:

✔ Quantities ✔ Unit costs ✔ Material costs ✔ Labor costs ✔ Subtotals & grand total ✔ Optional / add-on items ✔ Export button (Excel/CSV/PDF)

Reply with your answers in numbered format (e.g., “1: 2.7m, 2: Demolish wall entirely”, etc.).

User: 1. edit

  1. wall height 2.4m to 2.7m
  2. keep wall between kitchen and dining room.
  3. wall finish smooth plaster & paint.
  4. aluminum sliding door.
  5. no security grill on doors. no windows.
  6. water will be connected to existing household water line.
  7. have sewer line near the kitchen.
  8. best value faucet, standard lever.
  9. 4 light fixtures.
  10. dedicated circuits for: refrigerator, range hood, microwave, rice cooker.
  11. range hood.
  12. cabinet carcass included.
  13. Stone look laminate style.
  14. include all except for permit costs.
  15. Ceramic backsplash behind sink/cooktop
  16. Upper/lower aluminum cabinets. upper hanging cabinets mixed with open shelving.
  17. Paint Type - Boysen Permacoat Latex, dirty white or light grey.

Assistant: Awesome — based on your details I’ll prepare a detailed Bill of Quantities BOQ for your kitchen add-on 2 m × 5.4 m with… edit

Awesome — based on your details I’ll prepare a detailed Bill of Quantities (BOQ) for your kitchen add-on (2 m × 5.4 m) with separate Material & Labor costs optimized for Bocaue, Bulacan conditions. I’ll source real prices where possible (e.g., Wilcon, local supplier ranges) and provide links to products.

Before presenting the full BOQ spreadsheet, here’s a draft summary so you can confirm and tweak before I export it to Excel/CSV/PDF.

✅ PROJECT SUMMARY – KITCHEN ADD-ON (2 m × 5.4 m) edit

Gross Floor Area: 10.8 sqm Wall Height: ~2.4–2.7 m Foundation: Slab-on-Grade Walls: CHB + smooth plaster + paint Roof: Lean-to with p. tech corrugated ASA sheets Ceiling: PVC panel Floor: Tile Door: 120 cm aluminum sliding Opening: Adjoining wall stays Plumbing: Sink + faucet, connect to existing water & sewer Electrical: Lights & dedicated circuits Cabinetry: Laminate stone look with upper/lower cabinets + backsplash Ventilation: Range hood Includes: Masonry, electrical, plumbing, carpentry Excludes: Permit costs

🧱 KEY MATERIALS (with Prices & Links) edit

Countertop & Cabinets edit
  • Stone look laminate cabinet & countertop – custom build (material allowance) – Estimated material cost = ₱9,000 (Laminate panels + edge banding + hardware allowance — price varies by design)
Sink edit
  • Primy Radius 25 Undermount Single Bowl – approx. ₱6,760 (Good value undermount sink)
Faucet edit
  • Kitchen faucet best value (Wilcon) ≈ ₱880–₱1,500 range shop.wilcon.com.ph[2]
Range Hood edit
  • Hamden 60cm Chimney Type Rangehood – approx. ₱6,498 (Entry mid-range rangehood)
Tiles edit
  • Floor tiles (allowance) – ₱7,040 (your provided estimate)
Ceiling edit
  • PVC panel ceiling – ₱4,040 (your provided estimate)
Sliding Door edit
  • Aluminum sliding door 120 × 210 cm – ₱11,716 (your provided estimate)
Roofing edit
  • P.tech corrugated ASA roofing — ₱2,150/sheet (1.13 m × ~3.7 m coverage) Estimated sheets needed ≈ 5 → ₱10,750
Paint edit
  • Boysen Permacoat Latex (walls & ceiling) — allowance ₱6,000

🛠️ CONSTRUCTION WORKS & LABOR RATES (Provincial) edit

Typical provincial labor unit costs (updated ranges):

  • Masonry (CHB + plaster) ~ ₱25–₱50/sq.m finish StudyX[3]
  • Tiling ~ ₱80–₱150/sq.m StudyX[4]
  • Painting ~ ₱25–₱40/sq.m StudyX[5]
  • Electrical (fixture/outlet) ~ ₱150–₱250/unit StudyX[6]
  • Plumbing (fixtures + connections) ~ ₱200–₱350/fixture StudyX[7]
  • Carpentry / Cabinet install ~ ₱7,000–₱10,000 project labor

📊 DRAFT BOQ – MATERIALS & LABOR SEPARATE edit

| Item | Qty | Unit | MAT’L Cost (₱) | LABOR Cost (₱) | Total (₱) | | ----------------------------- | ---- | ---- | -------------- | -------------- | --------- | | Site Prep & Slab | | | | | | | Excavate, compact | 10.8 | sqm | 1,500 | 2,000 | 3,500 | | Slab concrete | 10.8 | sqm | 2,500 | 1,800 | 4,300 | | Walls (CHB + Plaster + Paint) | | | | | | | CHB 4” wall | 27.5 | sqm | 12,000 | 3,000 | 15,000 | | Mortar + Plaster finish | 27.5 | sqm | 3,300 | 2,200 | 5,500 | | Painting (walls) | 27.5 | sqm | 1,500 | 1,100 | 2,600 | | Roofing & Ceiling | | | | | | | Corrugated ASA sheet | 5 | pcs | 10,750 | 2,000 | 12,750 | | Lean-to framing | 10.8 | sqm | 7,000 | 4,500 | 11,500 | | PVC ceiling | 10.8 | sqm | 4,040 | 1,080 | 5,120 | | Flooring | | | | | | | Floor tiles + grout | 10.8 | sqm | 7,040 | 1,350 | 8,390 | | Doors & Openings | | | | | | | Aluminum sliding door | 1 | set | 11,716 | 2,200 | 13,916 | | Kitchen Fixtures | | | | | | | Undermount sink | 1 | pc | 6,760 | 400 | 7,160 | | Faucet | 1 | pc | 1,500 | 350 | 1,850 | | Cabinetry & Countertop | 1 | lot | 9,000 | 10,000 | 19,000 | | Backsplash ceramic | 4 | sqm | 1,800 | 1,200 | 3,000 | | Electrical | | | | | | | Light fixtures (4) | 4 | pcs | 4,000 | 1,000 | 5,000 | | Outlets & dedicated circuits | 4 | pcs | 2,400 | 1,200 | 3,600 | | Range hood | 1 | pc | 6,498 | 800 | 7,298 | | Plumbing | | | | | | | Water lines & drain | 1 | lot | 2,500 | 2,000 | 4,500 | | Misc & Contingency | | | | | | | Misc hardware/tools | | lot | 5,000 | — | 5,000 | | TOTAL | — | — | ₱108,004 | ₱43,170 | ₱151,174 |

Notes:
• Material prices are sourced/local allowances and your provided figures (tiling, ceiling, door) plus product sources where available.
shop.wilcon.com.ph
+1
• Labor reflects typical provincial rates adjusted for Bulacan.
StudyX
• This does not include permit fees (excluded per your request).

📌 QUESTIONS / ADJUSTMENTS BEFORE FINAL EXPORT edit

Before generating the Excel/CSV/PDF BOQ with line items, totals, and subtotals, please confirm:

  1. Should the range hood ducting/exhaust vent to outside be included?
  2. Do you want a gas cooktop provision (gas line installation) or just electric circuits?
  3. Should we include an allowance for electrical panel upgrade / breaker box?
  4. Would you like an itemized cabinetry schedule (upper vs lower counts) or keep it lump sum?
  5. Set contingency % (e.g., 5%, 10%) to buffer for price fluctuations?

Reply with your answers and I’ll produce the final BOQ export.

User: itemized cabinetry schedule upper vs lower counts. edit

itemized cabinetry schedule (upper vs lower counts). Set contingency % (e.g., 5%, 10%) to buffer for price fluctuations.

Assistant: I’ve created a fully itemized BOQ in the canvas with: edit

I’ve created a fully itemized BOQ in the canvas with:

  • ✅ Upper vs lower cabinet counts (clear widths & functions)
  • ✅ Separate material and labor costs
  • ✅ 10% contingency already applied and shown transparently
  • ✅ Costs optimized for Bocaue, Bulacan (provincial labor, practical materials)
  • ✅ Ready for contractor use or bidding comparison

You can now:

  • 📤 Export it directly (Excel / CSV / PDF)
  • ✏️ Ask me to revise quantities or specs
  • 💸 Ask for value-engineering (e.g., “cut ₱20k without sacrificing durability”)
  • 🗓️ Request a construction timeline / payment milestones
  • 🧾 Convert this into a formal contractor proposal

If you want next steps, just tell me what you want to optimize: cost, speed, durability, or aesthetics.

References edit

  1. "Kitchen BOQ Request". ChatGPT. Retrieved 2026-01-07.
  2. "shop.wilcon.com.ph". shop.wilcon.com.ph. Retrieved 2026-01-07.
  3. "StudyX". studyx.ai. Retrieved 2026-01-07.
  4. "StudyX". studyx.ai. Retrieved 2026-01-07.
  5. "StudyX". studyx.ai. Retrieved 2026-01-07.
  6. "StudyX". studyx.ai. Retrieved 2026-01-07.
  7. "StudyX". studyx.ai. Retrieved 2026-01-07.