Openai/6946c46b-6a10-8000-848d-d47a20720474
This conversation was exported from ChatGPT[1]
gpt-5-2 edit
User: Give me 20 question in lean six sigma yellow belt multiple choice select bthe correct answer edit
Give me 20 question in lean six sigma yellow belt multiple choice select bthe correct answer
Assistant: Sure! edit
Sure! Here are 20 Lean Six Sigma Yellow Belt multiple-choice questions. Select the correct answer for each question.
Lean Six Sigma Yellow Belt – Multiple Choice Test edit
- What is the main goal of Lean Six Sigma?
A. Increase employee workload B. Eliminate waste and reduce variation C. Increase inspection activities D. Improve marketing strategies
- What does the “Lean” part of Lean Six Sigma focus on?
A. Reducing defects B. Reducing waste and improving flow C. Statistical analysis D. Employee training
- What does Six Sigma primarily aim to reduce?
A. Cycle time B. Inventory C. Process variation and defects D. Employee turnover
- What does DMAIC stand for?
A. Design, Measure, Analyze, Improve, Control B. Define, Measure, Analyze, Improve, Control C. Develop, Measure, Analyze, Improve, Control D. Define, Manage, Analyze, Improve, Control
- Which phase of DMAIC identifies the problem and project goals?
A. Measure B. Analyze C. Define D. Control
- What is a “defect” in Six Sigma?
A. A broken machine B. Any product or service that fails to meet customer requirements C. A delayed delivery D. An employee mistake
- Who is considered the “customer” in Lean Six Sigma?
A. Only external buyers B. Only internal employees C. Anyone who receives the output of a process D. Only management
- What does VOC stand for?
A. Value of Cost B. Voice of Customer C. Variation of Control D. Value of Cycle
- Which tool is commonly used in the Measure phase?
A. SIPOC B. Control Chart C. Fishbone Diagram D. 5 Whys
- What does SIPOC stand for?
A. Supplier, Input, Process, Output, Customer B. System, Input, Process, Output, Control C. Supplier, Inventory, Process, Output, Cost D. System, Input, Product, Output, Customer
- Which of the following is NOT one of the 8 wastes (DOWNTIME)?
A. Defects B. Overproduction C. Transportation D. Motivation
- What does the “Analyze” phase focus on?
A. Monitoring the solution B. Identifying root causes C. Implementing improvements D. Collecting data
- Which tool helps identify the root cause of a problem?
A. Histogram B. Fishbone Diagram C. Check Sheet D. Run Chart
- What is Kaizen?
A. A one-time big improvement B. Continuous improvement involving everyone C. A quality inspection method D. A control tool
- Which phase of DMAIC implements solutions?
A. Define B. Measure C. Improve D. Control
- What is standard work?
A. Employee job description B. Best known method to perform a task consistently C. Training manual D. Company policy
- What is a process?
A. A single activity B. A series of steps that transform inputs into outputs C. A department D. A quality tool
- What does the Control phase ensure?
A. Problems are identified B. Improvements are sustained over time C. Data is collected D. Root causes are analyzed
- Which metric measures how capable a process is?
A. Cycle Time B. Process Capability (Cp, Cpk) C. Takt Time D. Lead Time
- What is the role of a Yellow Belt?
A. Lead complex projects B. Support improvement projects and understand basic tools C. Manage the entire Six Sigma program D. Perform advanced statistical analysis
If you want, I can also provide: ✔ Answer key ✔ Scoring sheet ✔ Printable test format ✔ Certificate template for the highest score
Just tell me 👍
References edit
- ↑ "Lean Six Sigma questions". ChatGPT. Retrieved 2025-12-21.