Openai/6946c46b-6a10-8000-848d-d47a20720474
This conversation was exported from ChatGPT[1]
gpt-5-2[edit | edit source]
User: Give me 20 question in lean six sigma yellow belt multiple choice select bthe correct answer[edit | edit source]
Give me 20 question in lean six sigma yellow belt multiple choice select bthe correct answer
Assistant: Sure![edit | edit source]
Sure! Here are 20 Lean Six Sigma Yellow Belt multiple-choice questions. Select the correct answer for each question.
Lean Six Sigma Yellow Belt – Multiple Choice Test[edit | edit source]
- What is the main goal of Lean Six Sigma?
A. Increase employee workload B. Eliminate waste and reduce variation C. Increase inspection activities D. Improve marketing strategies
- What does the “Lean” part of Lean Six Sigma focus on?
A. Reducing defects B. Reducing waste and improving flow C. Statistical analysis D. Employee training
- What does Six Sigma primarily aim to reduce?
A. Cycle time B. Inventory C. Process variation and defects D. Employee turnover
- What does DMAIC stand for?
A. Design, Measure, Analyze, Improve, Control B. Define, Measure, Analyze, Improve, Control C. Develop, Measure, Analyze, Improve, Control D. Define, Manage, Analyze, Improve, Control
- Which phase of DMAIC identifies the problem and project goals?
A. Measure B. Analyze C. Define D. Control
- What is a “defect” in Six Sigma?
A. A broken machine B. Any product or service that fails to meet customer requirements C. A delayed delivery D. An employee mistake
- Who is considered the “customer” in Lean Six Sigma?
A. Only external buyers B. Only internal employees C. Anyone who receives the output of a process D. Only management
- What does VOC stand for?
A. Value of Cost B. Voice of Customer C. Variation of Control D. Value of Cycle
- Which tool is commonly used in the Measure phase?
A. SIPOC B. Control Chart C. Fishbone Diagram D. 5 Whys
- What does SIPOC stand for?
A. Supplier, Input, Process, Output, Customer B. System, Input, Process, Output, Control C. Supplier, Inventory, Process, Output, Cost D. System, Input, Product, Output, Customer
- Which of the following is NOT one of the 8 wastes (DOWNTIME)?
A. Defects B. Overproduction C. Transportation D. Motivation
- What does the “Analyze” phase focus on?
A. Monitoring the solution B. Identifying root causes C. Implementing improvements D. Collecting data
- Which tool helps identify the root cause of a problem?
A. Histogram B. Fishbone Diagram C. Check Sheet D. Run Chart
- What is Kaizen?
A. A one-time big improvement B. Continuous improvement involving everyone C. A quality inspection method D. A control tool
- Which phase of DMAIC implements solutions?
A. Define B. Measure C. Improve D. Control
- What is standard work?
A. Employee job description B. Best known method to perform a task consistently C. Training manual D. Company policy
- What is a process?
A. A single activity B. A series of steps that transform inputs into outputs C. A department D. A quality tool
- What does the Control phase ensure?
A. Problems are identified B. Improvements are sustained over time C. Data is collected D. Root causes are analyzed
- Which metric measures how capable a process is?
A. Cycle Time B. Process Capability (Cp, Cpk) C. Takt Time D. Lead Time
- What is the role of a Yellow Belt?
A. Lead complex projects B. Support improvement projects and understand basic tools C. Manage the entire Six Sigma program D. Perform advanced statistical analysis
If you want, I can also provide: ✔ Answer key ✔ Scoring sheet ✔ Printable test format ✔ Certificate template for the highest score
Just tell me 👍
References[edit | edit source]
- ↑ "Lean Six Sigma questions". ChatGPT. Retrieved 2025-12-21.